隧道防火涂料施工要注意哪些流程?
发表时间:2018-07-25 18:13:29来源:/

1、选取防火涂料、检验施工机具。 产品应通过公安部消防产品型式鉴定,并经过公安部消防局批准,进行各项指标的检验,并确定佳喷涂厚度。施工主要机具:混合机、灰浆泵、计量容器、测厚仪、钢尺、喷涂机等。

1. Select the fire retardant coating and inspect the construction equipment. The products should be identified through the type of fire fighting products of the Ministry of public security and approved by the Fire Department of the Ministry of public security. Main construction equipment: mixing machine, mortar pump, measuring container, thickness gauge, steel ruler, spray machine, etc.
2、施工人员资格检查。防火涂料喷涂作业应由经过培训合格的操作人员施工,安全技术和劳动保护等要求,应按国家现行有关规定执行。
2. Inspection of the qualification of the constructors. The spraying work of fire retardant coatings shall be carried out by trained qualified operators, such as construction, safety technology and labor protection, etc., and shall be carried out in accordance with the relevant regulations of the state.
3、 基层检查:基层表面无浮尘、疏松物、油污,表面密实;每延米隧道蜂窝、麻面面积不超过0.5%,且深度不超过5mm;平顺无错台,无裂缝,表面平整度控制在8mm以内。
3, grass-roots inspection: the surface of the surface without dust, loose material, oil pollution, surface dense; the tunnel honeycomb, surface area of no more than 0.5%, and the depth of no more than 5mm; smooth and no fault, no cracks, surface roughness within the control of 8mm.
 专业防火涂料施工销售
4、防火涂料配料、搅拌 防火涂料应随用随配,使用的水应清洁、干净。胶粘剂的用量应通过粘结强度试验确定。搅拌后的浆料,应在1小时内用完,不得二次加水或存放时间过长后再次使用,以免影响粘结力。
4, fire-retardant paint ingredients, mixing fire retardant coating should be used with the match, the use of water should be clean and clean. The amount of adhesive should be determined by bond strength test. After mixing, the slurry should be used in 1 hours. Do not add water two times or store too long before it is used again, so as not to affect the bonding force.
5、施工厚度:第一遍喷涂厚度以不超过5mm为宜,以后喷涂厚度8mm左右,直至达到规定的厚度为止(一般达到12mm厚度,需喷涂2遍);厚度的检测依据CECS24:90标准执行。
5, the thickness of the construction: the first spray thickness is not more than 5mm, and then the thickness of spray thickness is about 8mm, until the specified thickness is reached (generally 12mm thickness, 2 times for spraying); the thickness of the test is carried out according to the CECS24:90 standard.
6、 下一遍喷涂应在头遍涂料表干后才能进行,表干时间与气温及涂层厚度有关,一般24小时左右。
6, the next coating should be carried out after the first drying of the paint. The drying time is related to the temperature and the thickness of the coating, usually about 24 hours.
7、在拱部颜色的喷涂方面,可以在后一遍喷涂的涂料里加拌设计颜色涂料,也可以先施工防火涂料至设计厚度后,加喷一道罩面漆。
7. In the painting of the color of the arch, the paint can be mixed with the paint in the paint that is sprayed again and again. It is also possible to build a fireproof paint to the design thickness and add a cover paint.
8、底层施工完成后,应及时根据设计腰线进行放线弹墨,对腰线以下及时压光。
8, after the completion of the underlying construction, the line should be designed according to the design waist line in a timely manner.
9、在大面积施工前,应先选取30米作试验段,取得成功经验后再推开实施。
9, before a large area of construction, 30 meters should be selected as the test section, and after successful experience, the implementation will be carried out.
10、底层防火涂料施工完成后,每道施工缝处及时切一条环向缝,切缝要整齐圆顺。
10. After the completion of the construction of the fire retardant coating at the bottom, every construction joint should cut a circular seam in time, and the seam should be neat and round.
专业防火涂料施工销售一直致力于为更多的客户提供服务,您的满意才是我们不断前行的动力!
Professional fire retardant coating construction and sales has been committed to serving more customers. Your satisfaction is our driving force.

地址:山东省济南市济阳县

电话:15764111118

Q Q:623837201

微信:18715220710

版权所有:山东黛凯商贸有限公司 天天彩票网jhxpbyv.com版权所有

技术支持:济南诺商

扫一扫联系

官方网站

友情链接:皇冠彩票网  W彩票官网  皇冠彩票官网  W彩票网  M5彩票  传奇彩票网  皇冠彩票  

免责声明: 本站资料及图片来源互联网文章,本网不承担任何由内容信息所引起的争议和法律责任。所有作品版权归原创作者所有,与本站立场无关,如用户分享不慎侵犯了您的权益,请联系我们告知,我们将做删除处理!